| | | 
Forum Guru
       
Group: Forum Members Last Login: Saturday, June 11, 2011 9:29 PM Posts: 226, Visits: 844 |
| I have followed in LinkedIN Data center professional group a Post discussing ideas, suggestions, from several DC professionals
Some of them advise for using overhead tray, (FO and/or copper cabling); others regarding that it is still worth to use the under floor cabling.
What do you think or have experienced ? taking in consideration
1. Architectural
*raised floor hight
*ground reference grid
*cleaning maintenance
*cabinets/racks hight (more 42RU)
*new,refurbished or
2. Cooling
* air flow obstructions
* hot/cold isles
* containment
* LIQUID (rack or server type)
* "FREE" -convection)
3. Energy
*cabling
*reneweable generation
4. Safety
*fire detection/supression (components hight)
*fire stopping
5.Security
*access (biometrical or not)
*cctv (IP or not)
6. Information Technology Transport
*cabling (FO & cooper) trunks or not
-category 6A (unshilded or shielded) and/or Class FA -cat 6 is not a consideration for this discussion-
-MACs (lay,dress, administration)
-40 & 100 GBps trasmission -10Gbps default installation-
*pathways
-ladder Vs mesh tray types
-support (under floor or over racks)
-ITS vs energy cabling pathways coordination (hight,etc)
*cabinets/racks
- w or wo/ chimmenies
-containment (cold or hot aisles)
- 42 RU or more
-liquid (panduit or rittal types)
*telecomm grounding & bonding (racks bondings)
*administration (software NOT HDW, tags,...)
In that post they wrote that we (bicsi people) do not have the envison for INTEGRATED solutions. So please your thougths.
saludos
roberto sanchez,RCDD
Perfil Activo y Creativo, S.A. de C.V.
México |
| | | | Forum Newbie
       
Group: Forum Members Last Login: Thursday, May 20, 2010 7:47 PM Posts: 1, Visits: 1 |
| Roberto-
I am a raised floor contractor so I have a tendency to push for raised floor. I usually find that a hybrid system of under floor cooling and over head cable management seems to be the most effective. If you are planning a data center, make sure you make the floor higher than anticipated. This will allow for some flexibility in future if you expand or if equipment demands more cooling.
Steven Przyborski
Architectural Floor Solutions
115 Southwind Circle
Roswell, Georgia 30076
Phone: 678-332-4176
Fax: 678-682-3518
sprzyborski@afsfloors.com |
| |
|
|